Turns each mutant's selection into a job and orders the jobs (design notes §10.6, §10.7). Pure: the durations come from the baseline, the previous killers from the last run.
A job's tests are ordered with the previous killer first, then the tests the probe saw
hit the site (hits of a :suite or :file selection; every test of a :tests one),
then the rest, each group by ascending recorded duration (the cheapest first). ExUnit
decides the order of tests inside a module (shuffled by the seed); a worker names the
modules to it in the order of the job's tests (Juggernaut.Peer.Runner.modules/2), so
the modules of the killer and of the hits start first. The order is made firmer by a
strike: a first run of the strike tests alone, and the rest only when the strike
does not kill.
- a previous killer among the job's tests is the strike;
- otherwise, a selection of the tests that hit the site (
:tests) with at least three tests strikes with the cheapest of them, since most mutants of code that many tests reach die to any of them; - otherwise, a
:suiteor:fileselection whose hits are some but not all of its tests strikes with the hits: a site that runs outside any test (a cast, asetup_all) is still most often killed by the tests that call it (D2); - otherwise there is no strike: the job runs every test at once.
Test lanes (E1, Juggernaut.TestLanes): a job's unit tests come first and its
integration tests (:integration) after them, each lane ordered as above, and its
runs are staged (stages/3): the unit lane's (its strike, then the rest), then, only
when every one of them passed, the integration lane's (its own strike, then the rest).
So a mutant that only an integration test kills was run against every unit test of
its selection first. A job with no integration test runs as before.
Timeouts are calibrated from the baseline, per lane (E3): each test's ExUnit timeout is
max(min_ms, multiplier × the slowest selected test of the lane), and the lane's
deadline is max(that timeout, multiplier × the lane's estimated cost), where the cost
is the sum of its selected tests' recorded durations (Juggernaut.Pool.Worker adds
its slack). The unit lane uses the :timeout option, the integration lane
:integration_timeout; a job's timeout_ms and deadline_ms are its unit lane's (its
integration lane's when it has no unit test), and integration_timeouts the
integration lane's.
Jobs are dispatched longest first (LPT) by estimated cost, ties by mutant id, each to the first idle worker.
A boot-set mutant (:boot) is listed for the boot lane, and when tests run its code
again after boot (its selection's warm is :tests, :file or :suite) it also gets
a warm-first job (warm_first: true, selection :warm_first) with those tests, whose
result only gives the boot-lane job a strike (Juggernaut.Runner.strikes?/1). When its
function is in :warm_safe (a declaration that applies, Juggernaut.WarmSafe), that
warm job is an ordinary one instead (selection :warm_first, no warm_first flag): its
result is the verdict, and the mutant is not listed for the boot lane.
Summary
Functions
The estimated cost of running tests: their recorded durations summed, in ms.
Whether a run of tests is an integration lane's: every one of them is in
integration (a list or set). An empty run is no lane's.
One mutant's job from its selection (see plan/2 for the options).
tests (in order) split into their lanes, with each lane's timeouts (see the module
doc; options as plan/2): tests with the unit tests first, integration (the
integration tests, in order), timeout_ms and deadline_ms (the unit lane's, or the
integration lane's when there is no unit test), and integration_timeouts (nil when
there is no integration test).
tests with killer first (when it is one of them), then those of hits, then the
rest, each group by ascending recorded duration (an unknown duration counts as 0), ties
by id.
The jobs of mutants (each with its selection by mutant id,
Juggernaut.Coverage.Selection), sorted for dispatch (queue/1), plus the mutants
for the boot lane and those no test covers. Options (all required)
Jobs in dispatch order: longest estimated cost first, ties by mutant id.
The runs a job makes, in order, each a list of tests (design notes §10.6): its unit
tests (those of tests not in integration) and then its integration tests, each lane
split into the tests of strike that are in it, then the rest of the lane. A lane with
no test makes no run, and a lane that is all strike or none of it makes one. The
runner makes them until one does not pass.
The strike of an ordered job (see the module doc), or nil.
{per-test timeout, job deadline} in ms for tests (see the module doc).
Types
@type job() :: %{ mutant: Juggernaut.Mutant.t(), selection: :tests | :file | :suite | :warm_first | :reconfirm, reason: String.t() | nil, tests: [test_id()], strike: [test_id()] | nil, integration: [test_id()], integration_timeouts: {pos_integer(), pos_integer()} | nil, cost_ms: non_neg_integer(), timeout_ms: pos_integer(), deadline_ms: pos_integer() }
@type timeout_config() :: [multiplier: number(), min_ms: pos_integer()]
Functions
@spec cost_ms([test_id()], %{required(test_id()) => non_neg_integer()}) :: non_neg_integer()
The estimated cost of running tests: their recorded durations summed, in ms.
Whether a run of tests is an integration lane's: every one of them is in
integration (a list or set). An empty run is no lane's.
@spec job(Juggernaut.Mutant.t(), map(), keyword()) :: job()
One mutant's job from its selection (see plan/2 for the options).
@spec lanes([test_id()], keyword()) :: %{ tests: [test_id()], integration: [test_id()], timeout_ms: pos_integer(), deadline_ms: pos_integer(), integration_timeouts: {pos_integer(), pos_integer()} | nil }
tests (in order) split into their lanes, with each lane's timeouts (see the module
doc; options as plan/2): tests with the unit tests first, integration (the
integration tests, in order), timeout_ms and deadline_ms (the unit lane's, or the
integration lane's when there is no unit test), and integration_timeouts (nil when
there is no integration test).
@spec order( [test_id()], %{required(test_id()) => non_neg_integer()}, test_id() | nil, [test_id()] ) :: [ test_id() ]
tests with killer first (when it is one of them), then those of hits, then the
rest, each group by ascending recorded duration (an unknown duration counts as 0), ties
by id.
@spec plan([Juggernaut.Mutant.t()], keyword()) :: %{ jobs: [job()], boot: [Juggernaut.Mutant.t()], no_coverage: [{Juggernaut.Mutant.t(), String.t()}] }
The jobs of mutants (each with its selection by mutant id,
Juggernaut.Coverage.Selection), sorted for dispatch (queue/1), plus the mutants
for the boot lane and those no test covers. Options (all required):
:selections-%{mutant_id => selection};:tests- every runnable test, for a:suiteselection;:durations- µs by test id (the baseline);:killers- the previous killer by mutant key;:timeout-[multiplier:, min_ms:]from the config;:integration- the integration tests (a set; optional, default none);:integration_timeout- the integration lane's timeout config (optional, default:timeout;Juggernaut.TestLanes.timeout/2).
Optional: :warm_safe, the functions (Juggernaut.WarmSafe.function_key/1) whose
boot-set mutants are settled on a warm worker (none by default).
Jobs in dispatch order: longest estimated cost first, ties by mutant id.
The runs a job makes, in order, each a list of tests (design notes §10.6): its unit
tests (those of tests not in integration) and then its integration tests, each lane
split into the tests of strike that are in it, then the rest of the lane. A lane with
no test makes no run, and a lane that is all strike or none of it makes one. The
runner makes them until one does not pass.
The strike of an ordered job (see the module doc), or nil.
@spec timeouts( [test_id()], %{required(test_id()) => non_neg_integer()}, timeout_config() ) :: {pos_integer(), pos_integer()}
{per-test timeout, job deadline} in ms for tests (see the module doc).